Buqayq Municipality Addresses Rain Effects: Emergency Plan Details and Numbers

In a swift and organized response to the weather fluctuations, the municipality of Buqayq Governorate initiated a series of intensive field operations to address the effects of the recent rainfall. These actions reflect the commitment of municipal authorities in the Kingdom of Saudi Arabia to ensuring the safety of citizens and residents, maintaining smooth traffic flow, and minimizing any damage to infrastructure caused by water accumulation.
Details of the rainfall situation and immediate response
The governorate of Buqayq experienced moderate to heavy rainfall, reaching approximately 20 mm, prompting the activation of the municipality's pre-approved emergency plan. The situation was handled with the highest level of preparedness, including continuous monitoring of weather developments and rapid intervention to pump water from critical accumulation points, both within residential areas of the governorate and in its affiliated villages and centers. The plan proved its effectiveness in providing an immediate response to incoming reports, reflecting a significant improvement in crisis and natural disaster management at the local level.
Human and mechanical capabilities harnessed
The mayor of Buqayq Governorate, Mohammed bin Aftan Al-Dhafeeri, explained the extent of the efforts exerted to contain the situation, noting that the municipality mobilized all its resources, deploying more than 26 pieces of specialized equipment and machinery for pumping and transporting water. The efforts were not limited to machinery alone; a large workforce of over 160 individuals participated in this field campaign, including supervising engineers, specialized technicians, and field workers, all working as a unified team around the clock to monitor the effects of the rainfall.
Figures and statistics reflect the scale of the achievement
Official statistics confirmed the success of the emergency plan in achieving its objectives with record speed, as specialized teams responded to 45 reports received from residents. As part of the field operations, three water tanks with a capacity of 3,000 gallons each were put into operation, bringing the total operational capacity to 9,000 gallons. The amount of water pumped and removed using heavy equipment and pumps reached approximately 135,000 gallons, which directly contributed to drying the streets and restoring normalcy.
The importance of proactive maintenance and community awareness
These efforts are particularly important in the context of preserving infrastructure and enhancing quality of life, a key objective of the Kingdom's Vision 2030. The municipality stated that its field teams not only pumped out the water but also worked simultaneously to clean stormwater drainage networks and remove any obstacles or debris that might impede water flow, ensuring the network's efficiency. In addition to these field efforts, the municipality also engaged in public awareness campaigns through social media platforms, disseminating warning messages and preventative guidelines.
In conclusion, the Buqayq Municipality noted that it continues to monitor the weather situation according to updates from the National Center for Meteorology, calling on everyone to fully cooperate and report any water accumulations or emergencies through the unified reporting center 940, while stressing the need to adhere to safety instructions and stay away from flood collection sites to ensure everyone’s safety.



