
89 million riyals allocated to water projects in Jazan serving 6 governorates
A strategic achievement to enhance water security in Jazan
In a move reflecting the Kingdom of Saudi Arabia's commitment to infrastructure development and achieving sustainable development, the National Water Company announced a major milestone: the completion and commissioning of an integrated water transmission and pumping system. This vital project, costing over SAR 89 million, aims to serve the mountainous governorates of the Jazan region. This initiative is part of a series of water projects in Jazan designed to meet the growing needs of the population and provide a reliable and sustainable water supply.
The geographical and historical context of water challenges in Jazan
Historically, the rugged mountainous terrain of the Jazan region has posed a significant challenge to infrastructure projects, particularly regarding the delivery of essential services such as potable water. The high altitudes and harsh conditions of these mountainous provinces have necessitated innovative engineering solutions and high operational costs. This underscores the importance of this project, which has successfully overcome geographical obstacles to ensure access to clean water for areas that previously relied on unsustainable or inaccessible water sources, representing a qualitative leap in the quality of life for residents of these highland regions.
Details of the new water system and its operational capacity
The new system implemented by the National Water Company includes an extensive network of water transmission lines, exceeding 41 kilometers in length. These lines are designed to efficiently connect the main pumping stations and distribution networks to the operational reservoirs. The construction work also included the creation of two strategic operational reservoirs with a total capacity of 2,000 cubic meters, ensuring stable pumping operations, providing a strategic water reserve to address any emergencies or potential outages, and minimizing water loss.
Serving thousands of beneficiaries in 6 mountainous governorates
The direct positive impact of this project extends to more than 89,000 beneficiaries across six major mountainous governorates in the Jazan region: Al-Raith, Al-Aydabi, Al-Ardah, Haroub, Al-Dayer, and Fifa. To ensure fair and efficient distribution, the system includes the operation of six advanced tanker filling stations with a daily distribution capacity of approximately 20,000 cubic meters. This daily pumping volume is sufficient to meet the basic needs of the population, directly contributing to urban and population development in these vital areas.
Expected impact and alignment with Saudi Vision 2030
At the local and regional levels, this achievement contributes to improving the quality of water services and facilitating access for beneficiaries, thus fulfilling the aspirations of the wise leadership to provide a decent standard of living. At the national level, these projects are fully aligned with the objectives of Saudi Vision 2030 and the Quality of Life Program. Water security is a fundamental pillar of economic and social development, and providing robust infrastructure in peripheral areas enhances tourism and agricultural investment opportunities in Jazan.
Commitment to the highest standards of quality and sustainability
In closing, the National Water Company emphasized its unwavering commitment to executing its projects according to the approved timelines, while adhering to the highest international standards of quality and performance. This advanced infrastructure aims to enhance operational efficiency, thereby ensuring the sustainability of national water resources and protecting the environment. The company continues to monitor the system's performance to guarantee its continued high efficiency, while planning to launch and implement further development projects that serve citizens and support the Kingdom's progress.



